OFFICIAL LEGAL TITLE
Clean Water Allotment Modernization Act of 2023
FREQUENTLY ASKED QUESTIONS
What is the official ID of this bill?
The official print number for this legislation is 118_S_115.
Which chamber initiated this legislation?
This legislation was initiated in the Senate.
When did the legislative process begin?
The process officially started on 2023-01-26.
What are the main provisions?
Key points include:
- Federal clean water funds are guaranteed at minimum 2023 levels through 2028, with additional funds based on state population.
- Beginning in 2029, funding distribution will be based on the actual infrastructure needs identified in regular, detailed surveys.
- The required infrastructure surveys must now include costs for system resilience against disasters and the replacement of 10% of old pipes over 20 years.
What is the specific legal status?
The current status is Expired.
Where can I read the full text of this legislation?
The full official text is available at:
View full text
Who is the primary sponsor?
The primary sponsor is Sen. Rubio, Marco [R-FL].
What is the latest detailed status?
The latest detailed status is: Introduced in Senate
Is this summary verified?
Yes. This content was analyzed by AI and verified by the Lustra Judge System on 2025-12-30.
What is the impact of this bill?
We don't know, that is up to you to decide. Summarizing raw data with AI is fundamentally different from predicting socio-economic outcomes. As of 2026, we believe impact assessment strictly requires a human in the loop to verify and judge.