Study Authorized for Western South Dakota Water Supply Project Feasibility.

This law authorizes the federal government to conduct a feasibility study to determine if it is possible and practical to build a system supplying municipal, rural, and industrial water from the Missouri River to Western South Dakota. If the study is positive, it could lead to increased water security and reliability for residents and businesses in the region. Up to $10 million is authorized for this study, with the federal share capped at 50% of the total cost.
Key points
Federal funds are allocated to study improving water access for residents and industry in Western South Dakota.
The study will assess the viability of piping water from the Missouri River to the regional water system.
$10 million is authorized for the study, with the federal government covering no more than 50% of the total costs.
article Official text account_balance Process page
Expired
Citizen Poll
No votes cast
Additional Information
Print number: 118_S_5216
Sponsor: Sen. Thune, John [R-SD]
Process start date: 2024-09-25