Fort Bliss Land Transfer for Flood Control and Water Supply in El Paso.
This bill authorizes the Secretary of the Army to transfer approximately 65 acres of land at Fort Bliss, Texas, including the Kay Bailey Hutchison Desalination Plant, to El Paso Water. The purpose of the conveyance is to enhance stormwater flood control for the base and the neighboring area, and to secure water supply. El Paso Water must pay the fair market value, which can include cash or in-kind consideration, such as discounted water rates for Fort Bliss.
Key points
Improved Flood Safety: The land transfer aims to strengthen stormwater flood control, directly benefiting the safety and property of residents near Fort Bliss.
Water Stability: The transfer includes critical infrastructure (Desalination Plant), potentially ensuring more stable and cost-effective water delivery for the military base and the local community.
Financial Terms: El Paso Water must pay the fair market value, which can be satisfied through cash or non-cash benefits, such as discounted water rates for Fort Bliss.
Reversion Clause: If the property is not used for the specified purposes (flood control/water), the ownership may revert back to the United States government.
Expired
Additional Information
Print number: 118_S_5529
Sponsor: Sen. Cruz, Ted [R-TX]
Process start date: 2024-12-12