FREQUENTLY ASKED QUESTIONS
What is the official ID of this bill?
The official print number for this legislation is 119_HR_3630.
Which chamber initiated this legislation?
This legislation was initiated in the House of Representatives.
When did the legislative process begin?
The process officially started on 2025-05-29.
What are the main provisions?
Key points include:
- Accelerates the Presidential permitting process for new international bridges and land ports of entry.
- Extends existing bridge regulations to include land border crossings, facilitating their development.
- Removes the requirement for certain environmental documents for Presidential permits, aiming to shorten project timelines.
What is the specific legal status?
The current status is Introduced.
Where can I read the full text of this legislation?
The full official text is available at:
View full text
Who is the primary sponsor?
The primary sponsor is Rep. Gonzales, Tony [R-TX-23].
What is the latest detailed status?
The latest detailed status is: Introduced in House
Is this summary verified?
Yes. This content was analyzed by AI and verified by the Lustra Judge System on 2025-12-22.