arrow_back Back to App

New Great Lakes Icebreaker: Strategy and Pilot Program

This act directs the Coast Guard to develop a strategy for designing and building a new icebreaker for the Great Lakes to ensure continuous navigation. It also establishes a five-year pilot program to assess the icebreaker fleet's ability to keep key waterways open during winter seasons. The goal is to enhance safety and efficiency of water transport in the region.
Key points
The Coast Guard must submit a strategy for the design and construction of a new Great Lakes icebreaker, including cost and delivery timelines.
A five-year pilot program will be conducted to determine if the icebreaker fleet can keep major waterways open 95% of the time during ice seasons.
Reporting requirements for icebreaking operation costs will be modified to increase transparency of public spending.
article Official text account_balance Process page
Introduced
Citizen Poll
No votes cast
Additional Information
Print number: 119_HR_4375
Sponsor: Rep. McDonald Rivet, Kristen [D-MI-8]
Process start date: 2025-07-14